Eco Green vision
  • Home
  • Services ‹
    • Tailor-Design/Build Heating and Cooling Projects
    • Central Plant Optimization
    • Healthcare Engineering Services
    • Energy Solutions and Optimization
    • HVAC Replacement, Upgrade, and Optimization
    • Energy Study and Investment Grade Audit (IGA)
    • Electrification Study and Solutions
  • About Us
  • Who We Are
  • Projects
  • Testimonials
  • Blog
  • Contact US

Sustainable Energy Solutions for Long Beach Unified School District by Eco Green Vision in Southern California.

Administration Building ($3.6 Million)

Hebat Badiee was the project lead for the Design/Build upgrade of the HVAC, lighting, control, air and water distribution of a four-story building while it was occupied. You can see below some of our Innovative Design/Build process through pictures of different parts of work. (Copyright Protected)

Client

Long Beach Unified School District

Budget

$3.6 Million

Long Beach Unified School District - Administration Building Long Beach Unified School District - Administration Building
NEW VARIABLE HOT WATER SYSTEM NEW VARIABLE HOT WATER SYSTEM
NEW VARIABLE HOT WATER SYSTEM NEW VARIABLE HOT WATER SYSTEM
NEW AIR-COOLED CHILLER NEW AIR-COOLED CHILLER
NEW AIR-COOLED CHILLER NEW AIR-COOLED CHILLER
NEW VARIABLE CHILLED WATER SYSTEM NEW VARIABLE CHILLED WATER SYSTEM
NEW VARIABLE CHILLED WATER SYSTEM NEW VARIABLE CHILLED WATER SYSTEM
NEW PRESSURE INDEPENDENT CONTROL VALVES NEW PRESSURE INDEPENDENT CONTROL VALVES
NEW PIC VALVES FOR AH UNITS NEW PIC VALVES FOR AH UNITS
NEW VARIABLE HOT WATER SYSTEM NEW VARIABLE HOT WATER SYSTEM
Long Beach Unified School District Long Beach Unified School District

Main Office

Address: 1230 N. Jefferson Street, Suite #M, Anaheim, CA 92807

Phone: (714) 905 9590

Copyright © 2025 EcoGreenVision | Get free quote | Designed & Managed by Top Organic Leads