Eco Green vision
  • Home
  • Services ‹
    • Tailor-Design/Build Heating and Cooling Projects
    • Central Plant Optimization
    • Healthcare Engineering Services
    • Energy Solutions and Optimization
    • HVAC Replacement, Upgrade, and Optimization
    • Energy Study and Investment Grade Audit (IGA)
    • Electrification Study and Solutions
  • About Us
  • Who We Are
  • Projects
  • Testimonials
  • Blog
  • Contact US

Huntington Memorial Hospital's Green Energy Project by Eco Green Vision in Southern California.

Multi-Phases

Hebat Badiee has been the lead Design/Build director serving Huntington Memorial Hospital since 2007 and has provided multi-OSHPD and non-OSHPD projects valued over 15 million dollars. Projects included but not limited to replacing centrifugal chiller, refinishing air handling units, replacing primary and secondary pumps, variable chilled water system, variable condenser water system, new energy management system, new motors, modification of patient rooms induction units, new lighting retrofit, chilled water system optimization and control, and new pressure independent control valves. These projects earned several hundreds of dollars grants/rebates, and helped the hospital save about two million dollars per year in utility bills. (Copyright Protected)

Client

Huntington Memorial Hospital

Budget

$15.5 Million

Huntington Memorial Hospital Huntington Memorial Hospital
TOTAL ENERGY SAVINGS of over $7.2 MILLION DOLLARS in 5 Yrs © - Chart TOTAL ENERGY SAVINGS of over $7.2 MILLION DOLLARS in 5 Yrs ©
NEW COOLING TOWER PUMPS NEW CENTRIFUGAL CHILLER (Estimated Savings $120,000) NEW COOLING TOWER PUMPS NEW CENTRIFUGAL CHILLER (Estimated Savings $120,000)
REPLACED EXISTING CHILLER (Est. Savings $250,000) REPLACED EXISTING CHILLER (Est. Savings $250,000)
NEW SECONDARY CHW PUMPS (Estimated Savings $320,000) NEW SECONDARY CHW PUMPS (Estimated Savings $320,000)
NEW INSULATION for STEAM SYSTEM (Est. Savings $85,000) NEW INSULATION for STEAM SYSTEM (Est. Savings $85,000)
NEW INSULATION for STEAM SYSTEM (260° F HEAT) NEW INSULATION for STEAM SYSTEM (260° F HEAT)
NEW VFD FOR THE PUMP (Estimated Savings $320,000) NEW VFD FOR THE PUMP (Estimated Savings $320,000)
EXISTING INEFFICIENT MOTOR for AH UNIT EXISTING INEFFICIENT MOTOR for AH UNIT
NEW MOTORS for AH UNITS (Estimated Savings $30,000) NEW MOTORS for AH UNITS (Estimated Savings $30,000)
After AHU REFURBISHMENT & Re-COMMISSIONING (Estimated Savings $390,000) After AHU REFURBISHMENT & Re-COMMISSIONING (Estimated Savings $390,000)
Before AH UNIT After AH UNIT REFURBISHMENT & Re-COMMISSIONING Before AH UNIT After AH UNIT REFURBISHMENT & Re-COMMISSIONING
NEW EFFICIENT LIGHTS - 40% OPERATING COST SAVINGS NEW EFFICIENT LIGHTS - 40% OPERATING COST SAVINGS
EXISTING INEFFICIENT LIGHTS EXISTING INEFFICIENT LIGHTS
NEW PIC VALVES for AH UNITS (Est. Savings $125,000 for only 35% of the AH Units) NEW PIC VALVES for AH UNITS (Est. Savings $125,000 for only 35% of the AH Units)
NEW PIC VALVES for AH UNITS (INCREASE ΔT F.) NEW PIC VALVES for AH UNITS (INCREASE ΔT F.)
NEW PIC VALVES for AH UNITS (INCREASE ΔT F.) NEW PIC VALVES for AH UNITS (INCREASE ΔT F.)

Main Office

Address: 1230 N. Jefferson Street, Suite #M, Anaheim, CA 92807

Phone: (714) 905 9590

Copyright © 2025 EcoGreenVision | Get free quote | Designed & Managed by Top Organic Leads