Central Plant Upgrades for Sustainable Energy Efficiency by Eco Green Vision in Southern California.
EcoGreenVision is performing the scope of work in the CSU Fullerton Central Plant, located in the basement of the McCarthy Hall, including installation of one 2,000 kW electric Heating Hot Water (HHW) boiler, three primary HHW pumps with variable frequency drives, 4000A unit substation switchgear board and supporting controls system.